Buff patio with gravel border & drain covers

FAQs

Landscaping FAQs in Edinburgh

Straight answers on costs, timescales, permissions in Scotland and what happens on the day.

These landscaping FAQs in Edinburgh answer the questions we're asked most – costs, timescales, permissions, drainage and what happens on the day.

Scottish planning and building rules differ from England's, and a lot of advice online is written for England. Everything here is written for Scotland, but rules change and every property is different, so treat this as a guide and check with the council where we say so.

01

Common landscaping FAQs in Edinburgh

Below are the general questions. Each service page also has its own FAQs.

Costs and quotes FAQs

How much will my job cost?

It depends on size, materials, ground conditions, levels and access. We give a fixed written quote after a free visit. Get a quote

Do you take a deposit?
Why do quotes for the same job vary so much?

Usually because of what's under the surface: depth of dig, amount of sub-base, edging, drainage and bedding. Ask any contractor exactly what's included.

Permissions in Scotland FAQs

Do I need planning permission for a fence or wall?

Usually not up to 2 metres high. Any part over 1 metre in front of the house where it faces a road needs permission, as does most work in conservation areas or at listed buildings. Garden walls, Fencing

Do I need permission for a driveway?

New hard surfaces in front gardens generally need to be permeable or drain into the garden to avoid needing planning permission. A new or wider entrance onto the road needs a dropped kerb approved by the council. Driveways

Do I need a building warrant for a slap through?

If the wall is load-bearing, almost certainly yes, along with an engineer's calculations. Slap throughs

Do I need permission for decking?

Most decks don't, but raised decks above around 0.5 metres usually do, and conservation areas have stricter rules. Decking

Timescales FAQs

How long does a patio take?

Around a week for a typical back-garden patio.

How long does a driveway take?

One to two weeks for most single or double driveways.

How long does fencing take?

One to two days for a typical back-garden run.

On the day FAQs

Do I need to be in?

Not all day, as long as we have access to the garden, water and somewhere to put materials.

What happens to the waste?

We remove our waste as part of the job.

What if it rains?

Light rain doesn't stop most groundwork. We won't lay mortar in heavy rain or hard frost, and we'll protect work in progress.

02

Still have a question?

Call or text 07426 792387 or send us a message.

Free quotes

Get a free, no-obligation quote

Call or text 07426 792387, or send photos through the quote form.

CallWhatsAppQuote